Compare the configurations
Place prototype and production-intent records side by side. Record changes in raw material grades, product presentation, primary pack and relevant manufacturing context.
Separate differences with little foreseeable influence from those relevant to a study attribute. Keep the reasoning clear enough for a new reviewer to follow.
Select the confirming evidence
Discuss whether existing evidence still addresses each decision. A promising appearance result on an early pack may need follow-up when the actual primary package arrives.
Record what must be tested or reviewed again and who will accept the comparison. Where evidence cannot yet be carried forward, mark the statement as provisional.
Finish the handover
Document the exact sample code, product version and approval scope. This makes the bridge usable when an order moves to a new batch or pack vendor.
If commercial production changes again, compare the new configuration against the approved baseline rather than repeatedly comparing it only with the immediately prior trial.
Frequently asked questions
Does a successful prototype study support any future production lot?
It supports conclusions within its reviewed configuration. The product team should establish how well the production configuration is represented.